Customer
Miller Davis
Completion Year
2015
Description
The project consisted of an installation of an epoxy floor coating system at the base of the bleachers in the walkway. Prep consisted of shot blasting to clean and create a profile on the floor. A prime coat of 100% solids epoxy was installed with a full broadcast of a sand aggregate. That was followed by a topcoat of 100% solids epoxy. This system created a durable, slip-resistant finish.
Tagged Epoxy Coating