Urethane Coating in Battle Creek at TRMI Inc.

Battle Creek

Customer

TRMI Inc.

Completion Year

2023

Description

After removing an existing floor coating back to bare concrete. H&H then patched any damage to the substrate and filled cracks and joints as needed. Followed by installing an epoxy prime coat, an intermediate coating of epoxy, and a top coat of a chemical-resistant urethane.