Urethane Cement Coating: Flooring Renovation in Plainwell
Customer Schweitzer Construction Completion Year 2020 Description This project was the JBS feet room. The room was being refurbed and new equipment installed. The floor was prepped using diamond grinding, shot blasting, and jackhammering. The floor required heavy repair with some holes being over six inches deep. Once all prep [...]
Diamond Grinding & Epoxy Coatings in Kalamazoo
Customer DeLoof Construction Completion Year 2020 Description This project was in an older section of the plant that they had removed the machinery out of the area in prep for a new line of equipment. The area had existing coatings, we used diamond grinding to remove all of the existing [...]
Urethane Cement Coating in Battle Creek: UMAMI Ramen
Customer Schweitzer Construction Completion Year 2020 Description This was a 100-year-old building being converted into a new restaurant. In the dining area, we Diamond ground the concrete to remove all the old adhesives from the existing floor coverings. We used a large diamond grinder and went over the floor with [...]
Lake Michigan College Epoxy Coating – St. Joseph
Customer Miller Davis Company Completion Year 2020 Description LMC art center was under renovation, rooms were in rough shape with old adhesives, lots of holes, and damage to the concrete floors. We diamond ground to remove all old adhesives, patched and repaired concrete substrate, and installed pigmented and clear epoxy [...]
Porter Hills Garage – Grand Rapids
Customer The Christman Company Completion Year 2020 Description This was an old garage area being converted into a storage room. The floor was old, cracked, and spalled. H&H prepped the surface by diamond grinding and patching the concrete. Then installed two coats of 100% solids Epoxy coating. More Projects Linkedin-in [...]
Concrete Floor Repairs in Portage: North Pines Church
Customer Meyer C Weiner Completion Year 2020 Description This project was turning an old fitness center into a church. All the old flooring was removed and old electrical trenches filled in. The floor was diamond ground to remove all old remnants of flooring materials. All cracks were filled and patching [...]
ConAgra Truck Dock Canopy – Exterior Acrylic Dry Fall
Customer ConAgra Foods Completion Year 2015 Description A continuation of the Truck Dock Canopy project that was completed in 2014. The underside consisted of cleaning via pressure washing to remove dirt and contaminants. Followed by mechanically abrading all rusted areas. All areas were primed with a coat of high solids, [...]
Bronson Healthcare Midwest Sports Medicine – Kalamazoo
Customer Bronson Healthcare Group Completion Year 2015 Description The project consisted of a complete interior and exterior repaint of the facility. H & H was able to complete all work during the day and without interruption to the daily operations of the facility. More Projects Linkedin-in Heart
Expert Interior Painting at Bronson Healthcare
Customer Bronson Healthcare Group Completion Year 2015 Description The project consisted of interior painting of a multi-floor renovation. More Projects Linkedin-in Heart
Professional Painting in Delton Michigan at High School Gym
Customer Miller Davis Company Completion Year 2015 Description The project involved a new auxiliary gym that was constructed next to the main gymnasium of the high school complex. The project involved painting multi-color graphics on the auxiliary gymnasium walls along with painting stenciled letters for the entrances to restrooms and [...]