Marshall Fire Station- Apparatus Bay Epoxy Line Striping – Marshall
Customer
Clark Construction Company
Completion Year
2015
Description
This project consisted of a newly constructed fire station. The fire truck apparatus bays required a new layout of line stripes. The new concrete floor was first shot blasted to create a profile of where the line stripes were to be installed. The line stripes were then painted with a high-solids polyamide epoxy.